Catch overruns
while you can still act

FeeLens watches every project fee as your team logs hours, phase by phase. The moment a project trends over its fee it turns amber, weeks before the damage reaches an invoice, while there's still time to change the outcome.

Free for 30 days · no credit card

WHWhitaker House

53 500 €
Total fee
55 052 €
Total spent
1 552 €
Current loss
1 837 h
Hours logged
Overhead isn't covered.
This work is running long; recover it in later phases. · Burning 1 274 €/week

Phases

SDSchematic Design
84%
100%
Fee16 500 €
Spent13 853 €
Profit+2 647 € · 16%
DDDesign Development
105%
100%
Fee21 500 €
Spent22 478 €
Loss−978 € · −5%
CDConstruction Documents
121%
62%
Fee15 500 €
Spent18 721 €
Loss−3 221 € · −21%
CAConstruction Administration
Billed hourly
Fee0 €
Spent0 €
Profit—

Needs attention

The quiet way
studios lose money

Most architecture projects don't lose money in one dramatic moment. They lose it an hour at a time: a third round of façade revisions, a permit set that takes two extra weeks, a client call that turns into a redesign. Each hour is justified. None of them shows up anywhere until someone opens the timesheet spreadsheet, usually at invoice time, when the fee is already spent.

Fixed fees make this worse. The fee was agreed months ago, split across phases in a proposal, and the only feedback loop is the one you build yourself. By the time construction documents start, nobody remembers whether schematic design used forty percent of the fee or sixty, and there's no moment where the project formally goes wrong. It just quietly stops being profitable.

Fee monitoring closes that loop. When every logged hour is priced and set against the phase it belongs to, an overrun stops being an end-of-project discovery and becomes a Tuesday-morning signal, early enough to rescope, restaff, or renegotiate.

How it works

From fee to alarm in three steps

164,000 €project fee
across 5 phases
CDConcept design15%24,600 €
SDSchematic design20%32,800 €
DDDesign development25%41,000 €
PSPermit set15%24,600 €
CDConstruction docs25%41,000 €
Total100%
1.0

Split the fee by phase

Enter the project fee and divide it across your phases: concept, schematic, permit, construction documents, site. Use your usual percentages; adjust per project.

3 rows imported from csv
MonSDSchematic design7:50
TueSDSchematic design6:30
WedDDDesign development8:00
ThuDDDesign development6:45
FriDDDesign development6:00
2.0

Hours flow in as work happens

Your team logs time through a quick form or a CSV import from the tracker they already use. Principals can add hours on anyone's behalf. No new habits required.

Riverside Apartments
Design Development
62%On pace
Riverside Apartments
Design Development
88%Trending over
Riverside Apartments
Design Development
112%Over budget
3.0

FeeLens does the math, live

Every hour is priced at its rate and burned against its phase budget. Green while the pace holds, amber when the trend points past the fee, red when the budget is gone.

01

A burn-down for every phase,
not a total for the project

A project total hides more than it shows. A project can sit comfortably at 70% of its fee while design development has already burned 120% of its share; the overrun just hasn't surfaced yet. FeeLens draws a separate burn-down for each phase, so the chart tells you not just whether you're over, but where.

Hover any point to see the week's hours, who logged them, and what they cost at each person's rate. The cumulative curve against the budget line is the whole interface: if the curve is heading for the line before the phase is heading for done, you know today.

DDDesign development
Fee budgetSpent
over budget
Week 1Week 12
02

Amber means act,
not autopsy

Most reporting tools tell you a project went over budget. That's an autopsy. FeeLens raises the flag on the trend: when a phase's pace of spending points past its budget, it turns amber while there is still fee left to protect, and red only once the budget is actually consumed.

Click a red project and the alarm decomposes: which phase, which weeks, which hours. That specificity is what makes the signal actionable: “schematic design is trending 15% over because of the March revisions” is a conversation you can have with a client. “We're over budget” is not.

Knowing which phase overran also tells you where to recover it. The phases still ahead haven't spent their share of the fee yet, so the same alarm points you into staffing to replan the hours that remain: move the coming weeks to whoever has room and see whether the project can still land under fee. The alarm finds the problem; the same numbers plan the fix.

And because the alarm is the only place FeeLens uses color, a wall of green genuinely means everything is fine. No dashboards to interpret; the absence of red is the report.

03

Built around the way
your studio already works

Fee monitoring only works if the hours actually arrive, so FeeLens keeps the cost of entry near zero. Import the CSV your current tracker already exports, add hours through a form that takes seconds, or log on behalf of the whole team after the Monday stand-up. Nobody has to adopt a new tool for the alarm to work.

Output is just as quiet. One weekly email summarizes where the studio stands (projected profit, the projects at risk, invoices past due), so the partner who never opens dashboards still sees the red before it costs anything. When a phase wraps, its tracked hours roll straight into an invoice.

Why FeeLens exists

At the architecture studio where I worked, we mailed our Toggl reports to the principal once a month, and he pasted them into a giant Excel file by hand. To his credit, it worked. At the end of every month he could tell us which projects were bleeding. A month of hours too late, through one person's spreadsheet.

That studio isn't around anymore, and not for lack of good architecture. Eighty hours of visuals on a few-thousand-euro job; the same detail redrawn five times for free. Every one of those losses was invisible until the rear-view mirror, and by then there were too many of them.

FeeLens is that spreadsheet without the month and without the one person: the same hours, priced against the fee, red the week it starts going wrong.

Mario Valkovic

Mario Valkovic

Creator of FeeLens

Questions,
answered

How is FeeLens different from a time tracker?
A time tracker records hours. FeeLens compares those hours, at each person's rate, against the fee you agreed with your client, phase by phase. The output isn't a timesheet; it's a live answer to “is this project still profitable?” You can keep your existing time tracker and import its CSV export.
What makes a project turn red?
Each phase of a project carries its share of the fee. As hours are logged, FeeLens burns that budget down and watches the pace. A phase goes amber when its trend points past the budget, and red once the budget is actually consumed. You get a warning before the overrun, not just a report after it.
Does my team have to change how they track time?
No. They can log hours through a simple form, import a CSV from your current tracker, or you can add hours on their behalf. FeeLens deliberately doesn't force a new tracking habit on the whole studio and the alarms work on whatever hours arrive.
Does it work for hourly projects, or only fixed fees?
Both. Fixed-fee projects are where the alarm is most useful. That's where quiet hours eat your margin. On hourly projects the same burn-down shows you when logged time is drifting past what the client expects, so the conversation happens before the invoice does.
Who in the studio sees the money?
That's up to you. Principals and admins see fees, rates, and profitability across the whole portfolio. Team members log hours and see their own workload in projects assigned to them.
How long does setup take?
One sitting. Create a workspace, add a project with its fee and phases, and import your first timesheet in less than 10 minutes. There's no sales call, no onboarding fee, and the first 30 days are free with no credit card.

Fewer spreadsheets.
More architecture.